Signed in as:
filler@godaddy.com
Signed in as:
filler@godaddy.com
You may want to finish your basement for yourself or turn it into a legal rental income suite. You may want to remove a load bearing wall to make the space more open concept.
For any of these changes, you will need to start with a free remote home inspection in Toronto/Ottawa. This will give everyone a better idea of what the scope of the project will be and what type of drawings and services will be required.
Call us today at: 437-808-7039 or through email at sabih@engineeredplans.ca
Once the home assessment is done and we received all the necessary measurements (this may require more than one visit to your home), we will prepare a set of permit drawings. This set includes a site plan, floor plans, elevations, and details as required by the scope of your project in Toronto or elsewhere.
You have the option to take this set of drawings and proceed with the application process, or, you can choose EngineeredPlans apply for the building permit on your behalf.
Preparation Include:
City Application Includes:
Post Permit Approval:
We provided engineering and design services for a basement walkout.
We provided engineering and design services for a basement walkout.
We provided engineering and design services for a basement walkout.
Scope of Work: Permit Drawings for Secondary Dwelling Basement Apartment
Client: Ahmed
Location: Ottawa, ON
Scope of Work: Permit Drawings for Secondary Dwelling Basement Apartment
Client: Harpreet
Location: Willowmere Way, Gloucester
We provided engineering and design services to renovate an existing unfinished basement unit.
We provided engineering and design services to legalize an existing basement.
1. Contact Us
2. Gather required information
3. Receive Quote
4. Receive Permit Drawings
Please reach us at if you cannot find an answer to your question.
In Ontario, obtaining a permit is necessary for renovating a basement. Specifically, basement renovations that involve structural modifications, changes to plumbing or electrical systems, or the creation of a livable space mandate the need of building permits.
Such renovations without the essential permits can result in fines and complications. Therefore, it is recommended to secure the appropriate permits before commencing any basement renovation project in Ontario.
Permit drawings for basement renovations have complete architectural and structural plans the current basement layout and the proposed changes to the basement.
These drawings are vital when seeking a building permit. These drawings show clear information needed by the city and include a site plan, floor plans, elevations, and requisite details. Local authorities utilize these permit drawings to evaluate proposed changes, ensuring adherence to building codes, safety regulations, and zoning ordinances. The precision and comprehensiveness of these drawings play a pivotal role in securing legal approval to proceed with your basement renovation project.
Building permits are typically needed for construction, demolition, renovation, and additions to residential, commercial, and industrial properties. Projects involving changes to a building’s structure, plumbing, or mechanical systems often require permits
The timeline for obtaining a building permit depends on the complexity of your project and the workload of the city’s building department. Simple projects may be approved in a few weeks, while more complex projects can take several months
Modifying permit drawings during construction can be possible, but it often depends on the nature and extent of the changes.
We recommend reaching out us to resolve changes in your current construction project. We will talk with the city and inspector to accurately show changes that were made one site after getting the permit approved. It’s essential to communicate any alterations promptly to us. We can assess the modifications and determine if they comply with regulations, and guide you on the necessary steps for approval.
We have worked with 100's of clients whose permit was previously rejected or had too many ongoing changes requested by the city. We will your review your application for Ontario Building Code, National Building Code and City By-laws to make sure it is not rejected again.
Incorporating crucial information like floor plans, elevations, sections, site plans, and construction specifications is imperative when creating permit drawings for a basement renovation. These drawings offer a comprehensive visual depiction of both the current layout and the intended changes, ensuring alignment with local building codes and regulations. The inclusion of all necessary details aids local authorities in accurately evaluating the project, facilitating the approval process for the permit required for your basement renovation.
The duration of a basement renovation permit in Toronto ranges from 6 months to 2 years, contingent on the permit category and the complexity of the project. It's important to be mindful of the permit's expiration date and initiate the process for renewal or extension if required, ensuring compliance with the stipulated timeframe.
The FASTRACK building Building permit service aims to issue permits for specific home renovation projects within a 5-business-day timeframe. However, it's important to note that FASTRACK applications are designed for minor interior renovations and projects without any external work. For more extensive projects like additions, garages, or new builds, the processing time is typically longer, depending on the project's individual scope.
It's often overlooked that the city of Toronto involves different departments in reviewing various aspects of an application. Different departments handle HVAC, life safety, and structural drawings. If your project involves external work, such as building an addition or a shed, the city of Toronto will also review it to ensure compliance with zoning by-laws. Obtaining a Building permit entails more than just submitting a few documents, which is why the process generally extends beyond the 5-day period.
We've encountered numerous clients facing similar issues. They acquire a property only to discover that the second-floor addition, deck, or secondary unit was not constructed in compliance with building codes and was erected unlawfully. The harsh reality is that, if you've purchased such a property, it now falls upon you to rectify the mistakes of the previous owners, despite them being the ones who implemented the changes. This is why conducting a thorough inspection before purchasing the home is crucial, ensuring that everything is in proper order.
According to legal obligations, sellers are required to disclose any additions or unpermitted work they are aware of. However, openly addressing this situation allows for collaboration with buyers, reassuring them that necessary adjustments can be undertaken. Selling a house with minor unpermitted work is indeed a viable possibility.
The rules and regulations regarding building without a Building permit vary by municipality in Ontario, and it's important to check with your local municipal building department for specific guidelines.
Constructing a backyard shed, garden shed, or storage shed does not necessitate a building permit if it is smaller than 160 square feet (or 15 square meters). However, any shed exceeding 160 square feet does require a building permit. It's important to note that building permits are obligatory for accessory structures with plumbing, irrespective of their size. For additional details, you can refer to the Toronto website.
In Ontario, it is illegal to build or renovate a building without the required permits. The legislative guidelines for constructing or renovating structures in the province are provided by the Building Code Act of Ontario. Without a valid permission, it is illegal to construct, dismantle, or permit the construction or demolition of a building. If these actions are carried out without the required authorization, there may be severe repercussions, such as fines, penalties, and possible legal action.
If found guilty of a breach of the 1992 Building Code Act, such as building without a permit, the fines might reach $100,000 for many infractions and $50,000 for first offenses.
Prepare Your Plans:
Complete Application Forms:
Submit Application:
Application Review:
Issuance of Permit:
Commence Construction:
Inspections:
Final Inspection and Occupancy:
See our detailed guide here.
1. If you would like to rent the basement as a second unit.
2. Add kitchen with Stove
We love our customers, so feel free to visit during normal business hours.
L3T 7X9, Thornhill, Ontario, Canada
Open today | 09:00 a.m. – 05:00 p.m. |
We use cookies to analyze website traffic and optimize your website experience. By accepting our use of cookies, your data will be aggregated with all other user data.