Engineered Plans

Engineered PlansEngineered PlansEngineered Plans
  • Sign In
  • Create Account

  • Bookings
  • My Account
  • Signed in as:

  • filler@godaddy.com


  • Bookings
  • My Account
  • Sign out

  • Home
  • Residential Permits
  • Commercial Permits
  • Secondary Dwelling Design
  • Our Team
  • Contact
  • Deck Permits
  • Toronto Permit Drawings
  • Basement Permit Process
  • Building Permit Process
  • More
    • Home
    • Residential Permits
    • Commercial Permits
    • Secondary Dwelling Design
    • Our Team
    • Contact
    • Deck Permits
    • Toronto Permit Drawings
    • Basement Permit Process
    • Building Permit Process

Engineered Plans

Engineered PlansEngineered PlansEngineered Plans

Signed in as:

filler@godaddy.com

  • Home
  • Residential Permits
  • Commercial Permits
  • Secondary Dwelling Design
  • Our Team
  • Contact
  • Deck Permits
  • Toronto Permit Drawings
  • Basement Permit Process
  • Building Permit Process

Account


  • Bookings
  • My Account
  • Sign out


  • Sign In
  • Bookings
  • My Account

Basement Renovation Permits in Toronto & gta

If you are looking to renovate your basement for personal or rental you have come to the right place. We offer the following services in Toronto:

  • Basement Finishing
  • Secondary Dwelling Unit
  • Layout Change
  • Raising Ceiling
  • New plumbing / HVAC / Mechanical

Call us today at: 437-808-7039 or through email at sabih@engineeredplans.ca

Leading Experts for Basement Permits

Once the home assessment is done and we received all the necessary measurements (this may require more than one visit to your home), we will prepare a set of permit drawings. This set includes a site plan, floor plans, elevations, and details as required by the scope of your project in Toronto or elsewhere.

You have the option to take this set of drawings and proceed with the application process, or, you can choose EngineeredPlans apply for the building permit on your behalf. 

FAQ's

Q: How long does a the permit process take?

- We usually deliver projects within 1 - 2 weeks, however we understand that each project is unique. City of Toronto takes anywhere between 1 - 2 months to finalize and approve permit.


Q: What is the cost to get the permit?

A: We offer competitive rates compared our industry partners. Please reach out to us for a quick   quote. 

Our Process:

 Preparation Include:

  1. Site Visit & Documentation
  2. Preliminary Design Review
  3. Building Permit Drawings
  4. We Offer Unlimited Design Revision


City Application Includes:

  1. Prepare Application Form
  2. Apply Application on Your Behalf
  3. Response to City Comments & Revise Drawings with NO Additional Charge
  4. Obtain Building Permit Approval

 

Post Permit Approval:

  1. Clarify Contractor Questions
  2. Permit resubmission due to design change


SECONDARY DWELLING PERMITS IN BRAMPTON

Secondary Dwelling Permits in Toronto

You may want to finish your basement for yourself or turn it into a legal secondary dwelling. We provide one worry free package that will help you get your secondary dwelling permit.  

For any of these changes, you will need to start with a free home inspection in Toronto. This will give everyone a better idea of what the scope of the project will be and what type of drawings and services will be required.

We look for the following things when we visit. 

  • Existing natural and artificial lighting
  • Means of egress and entrance to the secondary dwelling
  • Locations of bedrooms, kitchen and washrooms.
  • Minimum areas as required by OBC. 
  • New plumbing / HVAC / Mechanical


Find more details regarding Secondary Dwelling requirements here.

Find out more

BASEMENT WALKOUT PERMIT IN BRAMPTON

Basement Walkout Permit in Toronto

Are you looking to add a side entrance to your basement? At EngineeredPlans, we understand the importance of having a separate basement entrance in your home. It can separate your living spaces and increase the value of your property, and provide another form of egress to outdoor access. Our goal is to simplify the often complex process of obtaining these permits in Toronto & the GTA and ensure it is a smooth process for our clients.


We prepare engineered permit drawings for the concrete retaining walls, Footings, and side entrance as required by the Toronto Building permit department.



BASEMENT RENOVATION PERMIT BRAMPTON

Basement Renovation Permit Toronto

Basement Renovations is the easiest way to add living space to your existing home.  Interior renovations need building permit approved by the city of Toronto. We provide one worry free package that includes everything from onsite measurements to permit application. Reach out today to find out how we can help you.  

Contact Us

Recent Work

Home addition Building permit
Engineers in Toronto 
engineering firms Toronto

Richmond HIll Basement Renovation

We provided engineering and design services for a basement walkout.

Learn More
secondary dwelling Building permit
Engineers in Toronto 
engineering firms Toronto

Richmond Hill – Secondary Dwelling Residence

We provided engineering and design services for a basement walkout.

Learn More
secondary dwelling Building permit
Engineers in Toronto 
engineering firms Toronto

VAughan Secondary Dwelling

We provided engineering and design services for a basement walkout.

Learn More
secondary dwelling Building permit
Engineers in Toronto 
engineering firms Toronto

Crossgate – Secondary Dwelling Residence

Scope of Work: Permit Drawings for Secondary Dwelling Basement Apartment 

Client: Ahmed 

Location: Ottawa, ON 

Learn More
secondary dwelling Building permit
Engineers in Toronto 
engineering firms Toronto

Willowmere Way – Secondary Dwelling Residence

Scope of Work: Permit Drawings for Secondary Dwelling Basement Apartment 

Client: Harpreet

Location: Willowmere Way, Gloucester

Learn More
secondary dwelling Building permit
Engineers in Toronto 
engineering firms Toronto

Basement Rental Unit ConversioN - Mississauga, ON

We provided engineering and design services to renovate an existing unfinished basement unit.

Learn More
secondary dwelling Building permit
Engineers in Toronto 
engineering firms Toronto

existing finished basement legalization

We provided engineering and design services to legalize an existing basement.


Brampton Legal Basement Requirments

A professional firm specializing in Secondary Dwelling Permit APplication in Toronto

Here are some essential prerequisites for establishing a legal basement apartment: EngineeredPlans collaborates with landlords to secure the necessary permits for legal compliance, whether it involves retrofitting an existing unit or creating an entirely new secondary unit. 


EngineeredPlans emphasizes the importance of homeowners engaging with a fully insured business registered with the provincial Ministry of Community Affairs and Housing to ensure both quality and accuracy. Neglecting compliance may lead to fines of up to $25,000 if a complaint is filed by a neighbor or tenant about a potentially illegal basement. Such penalties far exceed the cost of ensuring compliance from the outset. If you have any inquiries or concerns regarding a basement apartment in Toronto, feel free to call us at 437-808-7039.


To obtain planning permission from the City of Toronto for the construction or legalization of a separate entrance to the basement apartment, technical drawings and plans are required. The cost for basement permit drawings service is $1150 + HST.


In the City of Toronto, obtaining a building permit is mandatory for establishing a basement apartment or secondary dwelling within an existing home. The requirements are based on the Ontario Building Code, specifically Part 9 of 2012 (as updated January 1, 2018), and Part 11 for homes over five years old. 


City of Toronto has intensified efforts against illegal sub-units through a dedicated task force. Homeowners are urged to ensure their secondary units are both legal and compliant.


Secondary dwellings play a vital role in providing affordable housing in Toronto, catering to individuals who might otherwise face housing challenges in the market. However, we advises caution against contractors offering illegal units, despite their potential cost advantages. The risks to one's home, family, and legal liability in case of tenant injury or worse are significant.


EngineeredPlans offers services to visit your basement apartment, take measurements, and create the necessary permit drawings and plans for obtaining the City of Toronto's building permit. The technical drawings, prepared by licensed engineers (P.Eng.), incur a cost of $1150 + HST. It is important to note that the owner bears sole responsibility for the construction and ongoing maintenance of the basement, assuming liability in case of breakdowns or accidents. Adhering to instructions is crucial in ensuring a safe and legal apartment, whether for family members or future tenants seeking additional income.


Basement Secondary Dwelling apartments are permissible in semi-detached dwellings and townhouses in Toronto, subject to zoning requirements and city-imposed restrictions. Legal registration with the City of Toronto is mandatory for a basement apartment to be considered lawful and secure for all residents.


For many Toronto residents, a basement represents a versatile space. It can be finished for personal use or converted into a legal rental income suite. Modifications like removing load-bearing walls or transforming a century-old basement into a functional living space may also be considered.

To circumvent the need for excavating 4 feet beneath the existing basement foundation for frost protection, alternative methods such as vertical insulation installation, extending insulation horizontally, and ensuring proper drainage may be employed. Adequate insulation is crucial for retaining heat and preventing heat loss around the base.


Moreover, the drywall separation between the basement and the rest of the house must possess a fire rating of at least 30 minutes. A separate exit is a requirement for safety. This exit ensures that a second unit, a self-contained housing entity within a house, is registered and thereby lawful.


Applications for second unit registration and building permits are accepted in person at the Flower City Community Campus. A total of 18 months is provided to complete the registration process from the date of application submission, ensuring compliance with all requirements.


When it comes to constructing basement bathrooms, the presence of either a fan or window is obligatory. 


The fee for registering a basement apartment in Toronto is as follows:

However, with the prospect of generating extra income comes added responsibility. Should you choose to develop a basement for rental purposes, meticulous adherence to legal guidelines and safety measures is imperative. The newly established basement apartments not only offer additional affordable rental housing in established neighborhoods but also contribute to making homeownership in Toronto more accessible.


Brampton Basement Requirments

Sample Plans Toronto Basement


Frequently Asked Questions

Please reach us at  if you cannot find an answer to your question.

In Ontario, obtaining a permit is necessary for renovating a basement. Specifically, basement renovations that involve structural modifications, changes to plumbing or electrical systems, or the creation of a livable space mandate the need of building permits. 

Such renovations without the essential permits can result in fines and complications. Therefore, it is recommended to secure the appropriate permits before commencing any basement renovation project in Ontario. 


Permit drawings for basement renovations have complete architectural and structural plans the current basement layout and the proposed changes to the basement. 


These drawings are vital when seeking a building permit. These drawings show clear information needed by the city and include a site plan, floor plans, elevations, and requisite details. Local authorities utilize these permit drawings to evaluate proposed changes, ensuring adherence to building codes, safety regulations, and zoning ordinances. The precision and comprehensiveness of these drawings play a pivotal role in securing legal approval to proceed with your basement renovation project. 


Building permits are typically needed for construction, demolition, renovation, and additions to residential, commercial, and industrial properties. Projects involving changes to a building’s structure, plumbing, or mechanical systems often require permits 


The timeline for obtaining a building permit depends on the complexity of your project and the workload of the city’s building department. Simple projects may be approved in a few weeks, while more complex projects can take several months


 Modifying permit drawings during construction can be possible, but it often depends on the nature and extent of the changes. 

We recommend reaching out us to resolve changes in your current construction project. We will talk with the city and inspector to accurately show changes that were made one site after getting the permit approved. It’s essential to communicate any alterations promptly to us. We can assess the modifications and determine if they comply with regulations, and guide you on the necessary steps for approval. 


We have worked with 100's of clients whose permit was previously rejected or had too many ongoing changes requested by the city. We will your review your application for Ontario Building Code, National Building Code and City By-laws to make sure it is not rejected again.


Incorporating crucial information like floor plans, elevations, sections, site plans, and construction specifications is imperative when creating permit drawings for a basement renovation. These drawings offer a comprehensive visual depiction of both the current layout and the intended changes, ensuring alignment with local building codes and regulations. The inclusion of all necessary details aids local authorities in accurately evaluating the project, facilitating the approval process for the permit required for your basement renovation. 


The duration of a basement renovation permit in Toronto ranges from 6 months to 2 years, contingent on the permit category and the complexity of the project. It's important to be mindful of the permit's expiration date and initiate the process for renewal or extension if required, ensuring compliance with the stipulated timeframe. 


The FASTRACK building Building permit service aims to issue permits for specific home renovation projects within a 5-business-day timeframe. However, it's important to note that FASTRACK applications are designed for minor interior renovations and projects without any external work. For more extensive projects like additions, garages, or new builds, the processing time is typically longer, depending on the project's individual scope. 


It's often overlooked that the city of Toronto involves different departments in reviewing various aspects of an application. Different departments handle HVAC, life safety, and structural drawings. If your project involves external work, such as building an addition or a shed, the city of Toronto will also review it to ensure compliance with zoning by-laws. Obtaining a Building permit entails more than just submitting a few documents, which is why the process generally extends beyond the 5-day period. 


 

We've encountered numerous clients facing similar issues. They acquire a property only to discover that the second-floor addition, deck, or secondary unit was not constructed in compliance with building codes and was erected unlawfully. The harsh reality is that, if you've purchased such a property, it now falls upon you to rectify the mistakes of the previous owners, despite them being the ones who implemented the changes. This is why conducting a thorough inspection before purchasing the home is crucial, ensuring that everything is in proper order.



According to legal obligations, sellers are required to disclose any additions or unpermitted work they are aware of. However, openly addressing this situation allows for collaboration with buyers, reassuring them that necessary adjustments can be undertaken. Selling a house with minor unpermitted work is indeed a viable possibility.  


Constructing a backyard shed, garden shed, or storage shed does not necessitate a building permit if it is smaller than 160 square feet (or 15 square meters). However, any shed exceeding 160 square feet does require a building permit in Toronto. It's important to note that building permits are obligatory for accessory structures with plumbing, irrespective of their size. For additional details, you can refer to the Toronto website. 


In Ontario, it is illegal to build or renovate a building without the required permits. The legislative guidelines for constructing or renovating structures in the province are provided by the Building Code Act of Ontario. Without a valid permission, it is illegal to construct, dismantle, or permit the construction or demolition of a building. If these actions are carried out without the required authorization, there may be severe repercussions, such as fines, penalties, and possible legal action. 

If found guilty of a breach of the 1992 Building Code Act, such as building without a permit, the fines might reach $100,000 for many infractions and $50,000 for first offenses. 


Pre-Application Consultation: 

  • Before starting the application process, it's advisable to have a pre-application consultation with EngineeredPlans. This allows you to discuss your project, understand local regulations, and receive guidance on the Secondary Dwelling Building permit application process. 

Prepare Your Plans: 

  • Create detailed plans and drawings of your existing and proposed basement construction project. These should include architectural, structural, mechanical, and electrical details that meet Toronto Permit Office Requirements. The level of detail required may vary based on the complexity of the project. 

Complete Application Forms: 

  • Fill out the necessary building Building permit application forms from City of Toronto provided by your local municipality. Include all required documentation, such as site plans, floor plans, elevations, and any other relevant information. Be sure to provide accurate and complete details to avoid delays. 

Submit Application: 

  • Submit the completed secondary dwelling application forms and supporting documents to the Toronto Building permit department. There is typically a submission fee, which varies depending on the municipality and the scope of the project. 

Application Review: 

  • The building permit department will review your secondary dwelling application to ensure it complies with local zoning by-laws, building codes, Toronto and Region Conservation Authority (TRCA) and other regulations. This process may involve multiple departments, such as planning, engineering, and fire services. 

Issuance of Permit: 

  • Once your application is approved, the building department will issue the building permit. This document grants you legal permission to begin construction. It will outline specific conditions and requirements that must be followed during the construction process. 

Commence Construction: 

  • With the Secondary Dwelling Building permit in hand, you can start the construction process. It's essential to adhere to the approved plans and any conditions specified in the permit. 

Inspections: 

  • Throughout the construction process, inspections may be required at various stages. Contact the building department to schedule inspections to ensure that the work complies with the approved plans and building codes. 

Final Inspection and Occupancy: 

  • Once construction is complete, a final inspection is typically required. If the work meets all the necessary standards, a Certificate of Occupancy or a similar document may be issued, allowing you to occupy or use the structure. 


See our detailed guide here.



1. If you would like to rent the basement as a second unit.

2. Add kitchen with Stove



Drop us a line!

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

Better yet, see us in person!

We love our customers, so feel free to visit during normal business hours.

Engineered Plans

L3T 7X9, Thornhill, Ontario, Canada

Hours

Today

Closed

Copyright © 2022 Engineered Plans - All Rights Reserved.

Powered by

  • Toronto Permit Drawings
  • Toronto Basements
  • Basement Permit Process
  • Building Permit Process
  • Dundas – Renovation of
  • Richmond Hill Permit
  • Valleymede Drive
  • Vaughan Permit
  • Ottawa Secondary Dwelling
  • Willomere

This website uses cookies.

We use cookies to analyze website traffic and optimize your website experience. By accepting our use of cookies, your data will be aggregated with all other user data.

Accept