Signed in as:
filler@godaddy.com
Signed in as:
filler@godaddy.com
If you are looking to renovate your basement for personal or rental you have come to the right place. We offer the following services in Brampton:
Call us today at: 437-808-7039 or through email at sabih@engineeredplans.ca
Once the home assessment is done and we received all the necessary measurements (this may require more than one visit to your home), we will prepare a set of permit drawings. This set includes a site plan, floor plans, elevations, and details as required by the scope of your project in Toronto or elsewhere.
You have the option to take this set of drawings and proceed with the application process, or, you can choose EngineeredPlans apply for the building permit on your behalf.
Q: How long does a the permit process take?
- We usually deliver projects within 1 - 2 weeks, however we understand that each project is unique. City of Brampton takes anywhere between 1 - 2 months to finalize and approve permit.
Q: What is the cost to get the permit?
A: We offer competitive rates compared our industry partners. Please reach out to us for a quick quote.
You may want to finish your basement for yourself or turn it into a legal secondary dwelling. We provide one worry free package that will help you get your secondary dwelling permit.
For any of these changes, you will need to start with a free home inspection in Brampton. This will give everyone a better idea of what the scope of the project will be and what type of drawings and services will be required.
We look for the following things when we visit.
Find more details regarding Secondary Dwelling requirements here.
Are you looking to add a side entrance to your basement? At EngineeredPlans, we understand the importance of having a separate basement entrance in your home. It can separate your living spaces and increase the value of your property, and provide another form of egress to outdoor access. Our goal is to simplify the often complex process of obtaining these permits in Brampton & the GTA and ensure it is a smooth process for our clients.
We prepare engineered permit drawings for the concrete retaining walls, Footings, and side entrance as required by the Toronto Building permit department.
Basement Walkout Cost Factors
1. Excavation Depth: The deeper your house is the more expensive walkout excavation is going to be. Footing details add 2-4 feet in depth.
2. Accessibility: Can Rock Basements get in there with an excavator or do we have to manually dig and transport soil to front of the house?
3. Size of Walkout: Minimum size door and walkup stairs cost less than larger landing with wide concrete stairs that require wider excavation.
4. Materials Used: Poured concrete walls for basement walkout add to the costs. The easiest and economical way to build with reinforced cinder blocks
5. Drainage Complexity: At the bottom of landing drain system needs to be installed. It is connected to house drainage system to divert water.
Basement Renovations is the easiest way to add living space to your existing home. Interior renovations need building permit approved by the city of Toronto. We provide one worry free package that includes everything from onsite measurements to permit application. Reach out today to find out how we can help you.
We provided engineering and design services for a basement walkout.
We provided engineering and design services for a basement walkout.
We provided engineering and design services for a basement walkout.
Scope of Work: Permit Drawings for Secondary Dwelling Basement Apartment
Client: Ahmed
Location: Ottawa, ON
Scope of Work: Permit Drawings for Secondary Dwelling Basement Apartment
Client: Harpreet
Location: Willowmere Way, Gloucester
We provided engineering and design services to renovate an existing unfinished basement unit.
We provided engineering and design services to legalize an existing basement into a secondary dwelling. We provide free consultation on things required for your home to meet your cities secondary dwelling requirements.
Basements often lack natural light, and incorporating a walkout can provide a distinct advantage. There are two approaches to enhance natural light in this context. One involves creating a larger cutout and installing a side window panel adjacent to the exterior door. Alternatively, opting for an exterior door with increased glass in the middle facilitates more natural light. Both of these options also allows for Lighting requirements to be met for Secondary Dwelling Basements.
While it stands as one of the more affordable structural undertakings for a house, the cost exceeds $20,000, making it unaffordable for many. It does seem expensive for those who don’t fully understand the amount of work involved in adding a basement entrance.
When paired with a Secondary Dwelling Unit, the walkout provides up to a 10% ROI per year.
In Toronto, older homes typically feature a single pathway traversing through and around the house. Staircases provide access to various floors, including the basement, and having a main entrance leading to the rear from a deck is considered a luxury not universally enjoyed.
More commonly, homeowners find themselves circumventing the house to access their backyard. The introduction of a basement walkout provides an additional pathway through the house, allowing for an exit at the rear or side of the residence. This also allows for residents of the Secondary Dwelling to access the basement without invading the privacy of the upstairs unit.
In Toronto, property taxes are already high city officials hold the authority to reassess property taxes after a permit is concluded, potentially raising property tax by 10 to 15%. For an estimate of the potential property tax hike in your area for such a project, please consult our project manager or architect team.
Every addition or renovation to a property has the potential to boost its value if done correctly, but a basement walkout takes it to a whole new level. This is primarily because it provides additional functionality and purpose to the house, making it considerably more valuable than the initial construction investment.
Analyzing the real estate market, we can determine that properties with a transformed basement or the potential for a basement unit with a walkout command a premium of at least $45,000 compared to identical properties lacking such features.
Basement Renovations require lots of demolition and new materials. The process takes anywhere between a 6 months to a year. Some of the structural change done to the home at this point are permanent and forever change the look of the home.
The most common reason of adding a secondary entrance in Toronto housing is the opportunity to divide the space into secondary dwelling. Both investors and homeowners aspire to rent out a portion of their residence to generate additional income and offset expenses. Shared interior spaces within the building often prove inconvenient and diminish the available square footage. Opting for a separate entrance allows for easy access for everyone
Here are some essential prerequisites for establishing a legal basement apartment: EngineeredPlans collaborates with landlords to secure the necessary permits for legal compliance, whether it involves retrofitting an existing unit or creating an entirely new secondary unit.
EngineeredPlans emphasizes the importance of homeowners engaging with a fully insured business registered with the provincial Ministry of Community Affairs and Housing to ensure both quality and accuracy. Neglecting compliance may lead to fines of up to $25,000 if a complaint is filed by a neighbor or tenant about a potentially illegal basement. Such penalties far exceed the cost of ensuring compliance from the outset. If you have any inquiries or concerns regarding a basement apartment in Brampton, feel free to call us at 437-808-7039.
Sample Plans Brampton Basement
Please reach us at if you cannot find an answer to your question.
In Ontario, obtaining a permit is necessary for renovating a basement. Specifically, basement renovations that involve structural modifications, changes to plumbing or electrical systems, or the creation of a livable space mandate the need of building permits.
Such renovations without the essential permits can result in fines and complications. Therefore, it is recommended to secure the appropriate permits before commencing any basement renovation project in Ontario.
Permit drawings for basement renovations have complete architectural and structural plans the current basement layout and the proposed changes to the basement.
These drawings are vital when seeking a building permit. These drawings show clear information needed by the city and include a site plan, floor plans, elevations, and requisite details. Local authorities utilize these permit drawings to evaluate proposed changes, ensuring adherence to building codes, safety regulations, and zoning ordinances. The precision and comprehensiveness of these drawings play a pivotal role in securing legal approval to proceed with your basement renovation project.
Building permits are typically needed for construction, demolition, renovation, and additions to residential, commercial, and industrial properties. Projects involving changes to a building’s structure, plumbing, or mechanical systems often require permits
The timeline for obtaining a building permit depends on the complexity of your project and the workload of the city’s building department. Simple projects may be approved in a few weeks, while more complex projects can take several months
Modifying permit drawings during construction can be possible, but it often depends on the nature and extent of the changes.
We recommend reaching out us to resolve changes in your current construction project. We will talk with the city and inspector to accurately show changes that were made one site after getting the permit approved. It’s essential to communicate any alterations promptly to us. We can assess the modifications and determine if they comply with regulations, and guide you on the necessary steps for approval.
We have worked with 100's of clients whose permit was previously rejected or had too many ongoing changes requested by the city. We will your review your application for Ontario Building Code, National Building Code and City By-laws to make sure it is not rejected again.
Incorporating crucial information like floor plans, elevations, sections, site plans, and construction specifications is imperative when creating permit drawings for a basement renovation. These drawings offer a comprehensive visual depiction of both the current layout and the intended changes, ensuring alignment with local building codes and regulations. The inclusion of all necessary details aids local authorities in accurately evaluating the project, facilitating the approval process for the permit required for your basement renovation.
The duration of a basement renovation permit in Toronto ranges from 6 months to 2 years, contingent on the permit category and the complexity of the project. It's important to be mindful of the permit's expiration date and initiate the process for renewal or extension if required, ensuring compliance with the stipulated timeframe.
The FASTRACK building Building permit service aims to issue permits for specific home renovation projects within a 5-business-day timeframe. However, it's important to note that FASTRACK applications are designed for minor interior renovations and projects without any external work. For more extensive projects like additions, garages, or new builds, the processing time is typically longer, depending on the project's individual scope.
It's often overlooked that the city of Toronto involves different departments in reviewing various aspects of an application. Different departments handle HVAC, life safety, and structural drawings. If your project involves external work, such as building an addition or a shed, the city of Toronto will also review it to ensure compliance with zoning by-laws. Obtaining a Building permit entails more than just submitting a few documents, which is why the process generally extends beyond the 5-day period.
We've encountered numerous clients facing similar issues. They acquire a property only to discover that the second-floor addition, deck, or secondary unit was not constructed in compliance with building codes and was erected unlawfully. The harsh reality is that, if you've purchased such a property, it now falls upon you to rectify the mistakes of the previous owners, despite them being the ones who implemented the changes. This is why conducting a thorough inspection before purchasing the home is crucial, ensuring that everything is in proper order.
According to legal obligations, sellers are required to disclose any additions or unpermitted work they are aware of. However, openly addressing this situation allows for collaboration with buyers, reassuring them that necessary adjustments can be undertaken. Selling a house with minor unpermitted work is indeed a viable possibility.
Constructing a backyard shed, garden shed, or storage shed does not necessitate a building permit if it is smaller than 160 square feet (or 15 square meters). However, any shed exceeding 160 square feet does require a building permit in Brampton. It's important to note that building permits are obligatory for accessory structures with plumbing, irrespective of their size. For additional details, you can refer to the Toronto website.
In Ontario, it is illegal to build or renovate a building without the required permits. The legislative guidelines for constructing or renovating structures in the province are provided by the Building Code Act of Ontario. Without a valid permission, it is illegal to construct, dismantle, or permit the construction or demolition of a building. If these actions are carried out without the required authorization, there may be severe repercussions, such as fines, penalties, and possible legal action.
If found guilty of a breach of the 1992 Building Code Act, such as building without a permit, the fines might reach $100,000 for many infractions and $50,000 for first offenses.
Prepare Your Plans:
Complete Application Forms:
Submit Application:
Application Review:
Issuance of Permit:
Commence Construction:
Inspections:
Final Inspection and Occupancy:
See our detailed guide here.
1. If you would like to rent the basement as a second unit.
2. Add kitchen with Stove
We love our customers, so feel free to visit during normal business hours.
L3T 7X9, Thornhill, Ontario, Canada
Today | Closed |
We use cookies to analyze website traffic and optimize your website experience. By accepting our use of cookies, your data will be aggregated with all other user data.